Today at 11:30 AM, took place the ceremony of one between the many projects that Italian PRT is realizing in Herat’s province. The CIMIC CENTER, within the “PRAESIDIUM” Operation in HERAT – AFGHANISTAN, was requested to take up the project by the Local Authorities, in particular by the GENERAL director of Western Jails Gen. Alhaj Abdul Majeed Sadiqi, in order to realize a new security system for external and internal female and male Herat Jails.
The realization of new security system for Herat Jail is a part a wider project aimed to reorganize of the Ministry of Justice compound where Herat Provincial Jails are located. To carry out this project, the Italian PRT has just built a detention house for young people, (Juvenile Correctional Center), twenty Lodgings for Jail employee’s families, a Female Correctional Center, and has refurbished two existing buildings for the rehabilitation of drug addictioned prisoners In detail the project, that has a cost of 36.900 Euro, is constituted by following works. The new electric line will be connected to the existing main electric one; the main line and the secondary line (to each pole) are quite totally external and protected by pipes of rigid and strong material with rigid rings. The new security system is based on digital technology and the main line is composed by optical fibre. From the cameras (type fixed, with night visor and led infrared) the data arrive to control room across the optical line passing from the Rack box to the servers and are checked and stored.Control room is into the director’s office room (in front of the Male Jail), like recommended by the Local Authority; the room will be built on the upper floor.The Italian Representation was composed by the PRT Commander, Col. Claudio Dei, the CIMIC.C Commander, Lt. Col. Fabrizio Zacchè and MsORRICO, ISAF HQ POLAD.