Today took place the first stone ceremony of one between the many projects that Italian PRT is realizing in
The district will be divided into two floors, with a common hall placed in the middle of the building that receives daylight through a central skylight, covered with a nimble structure created by composing glasses with iron beams and plates. The project will have a total cost of about 80.000 €.
The ground floor contains the director office, with a dedicated bathroom and a secretary office, the guard office and service personnel offices, the weapons depot, separated detention rooms for male and female, common baths, kitchen with warehouse and dining room for the policemen.
The 1st floor will be assigned to restrooms, divided between male and female with separated bathrooms, plus a restroom for officers, two work offices and a small warehouse.
The police district will be complete of water tanks for about
he refurbishment of a buiding for ANA in Herat Civil Airport together with many other projects and donations of materials for ANA, ANP e Border Police, for a total amount of about € 2.800.000
For year 2010 the PRT is going to realize 2 new police districts and 5 surrounding walls with guard rooms and water wells in Kohsan, Gulran, Adraskan, Robat Sangi and Zenda Jan, for a total estimated amount of about € 280.000.
هیچ نظری موجود نیست:
ارسال یک نظر