Yesterday at 15 PM the PRT Commander, Col. Claudio DEI and the CIMIC Center Commander, Ltc Fabrizio ZACCHE’ have visited the WOMEN AFFAIRS DEPARTMENT of Herat City to check the building just refurbished by a local Construction Company thanks to the material donated by PRT for a total amount of 19.500 Euro
۱۳۸۸ دی ۹, چهارشنبه
Help of Italian PRT For Herat Women Affairs Department
۱۳۸۸ دی ۴, جمعه
Inauguration of School by Italian PRT in Gulran District of Herat Province
The PRT took up the project for a 8 classroom school near Zahkani village – Gurlan district, requested by the local authorities, in this instance by the Director of Herat Education Department, in order to improve the poor number of educational infrastructures nowadays present into the District.
The project, that has a cost of € 96.833, was constituted by a quadrangular plan building on one floor levels of 645 sqm. The classroom are developed along a central corridor, to simplify route and, eventually, building new classroom for students increase.
All around is build up brick masonry surrounding wall with inside playground, latrine building, generator rooms and external sewage system.
Concerning the structure, the building is made up of pillars and beams in reinforced concrete and walls of solid baked bricks of the traditional local type. The inner sides will be coated with plaster, so as to be proper for the purpose. The foundations are made up of plinths in reinforced concrete and continuous stonewalls below the beams connecting the pillars. The floor will have to be higher at least
The building has a well for 3 water supplies and is provided of an external sewage system. As there is no urban drainage system to connect to, the solution proposed, in conformity with the local system normally used, is a tank to be periodically emptied.
The Italian Representatives were composed by PRT Commander, Col. Claudio Dei and the PRT CIMIC.C Commander, Lt. Col. Fabrizio Zacchè.
All the local representatives have thanked Italian PRT for the extraordinary contribution to their Country’s reconstruction, with truly and deep appreciation words for Italian military’s operate in cooperation activities.
From March 2009 PRT has started 8 projects in Education sector most of which are still on going for a total amount of € 791.377. Until now PRT has completed the realization of a 8 classroom school in Niswan Nang Abad – GHORYAN District and the Hall in the Herat central library to exhibit sculptures and pictures; moreover PRT performed the renovation of an existing, old female school: the KHOJA MOHAMAD KANJANI High School in Siawashan – GUZHARA District in joint cooperation with “Cooperazione Italiana” that supplied with school equipment and other material for the schoolboys.
Altogether from year 2005 up today the Italian PRT has realized 34 new schools and has delivered equipment, for example chairs, table and teacher’s table, and other material necessary for children’s lessons
In 2010 the PRT is going to realize and refurbish 6 schools in various districts more a building for the Education Department in Herat for a total amount of € 1.054.000
Italian Donated Orphans in Herat Province
The Commander of TASK FORCE “GRIFO” – Italian “Guardia di Finanza”, LTC Stefano IZZO and his Staff, with the cooperation of CPT DI MARCO from PRT/CIMIC in Herat, have visited the SABA SHAHID female orphanage, located in a remote and poor area of Herat City. The Institute gives shelter to 85 females of different ages. The visit has been a rare opportunity for all military present to know a cross-section of Afghan society, interacting and enjoying with the little afghan girls hosted in the Orphanage. The mood was happy and peaceful, the children were excited but polite and the military staff didn’t hesitate to carry on some of them and take a picture together.
۱۳۸۸ آذر ۲۵, چهارشنبه
Inauguration of Karize By Italian PRT in Enjil District
The PRT took up the project requested by the local authorities, in this instance by the Director of Herat Rural Rehabilitation & Development Department, in order to improve the living conditions of the inhabitants of the village of Naeeb Rafee inside the District of Injil, HERAT Province. The project, that has a cost of € 40.956, was constituted by the development of the Karize, a system of wells and canals that bring water to the villages, allowing the improvement, the effectiveness and the growth of the agricultural activity.
To realize the project has been required the following activities:
- development of 4 wells of the Karize with works of excavation and cleaning of the collapsed parts;
- reconstruction of the vertical auctions with circular rings in RCC and horizontal with elements always prefabricated elliptic in RCC, works of foundation with blocks prefabricated in PCC and RCC lintels;
- development of
۱۳۸۸ آذر ۲۳, دوشنبه
New Projects by Italian PRT in Guzare District of Herat Province
Today at
Concerning the structure, the building is made up of pillars and beams in reinforced concrete and walls of solid baked bricks of the traditional local type. The inner sides will be coated with plaster, so as to be proper for the purpose. The foundations are made up of plinths in reinforced concrete and continuous stonewalls below the beams connecting the pillars. The floor will have to be higher at least
Vocational Center By Italian PRT in Enjil District
Yesterday at
In detail the buildings, that has a cost of € 53.253, will be composed by a rectangular plan building on one floor levels of 475 sqm. and the rooms are developed along a central corridor, to simplify route. All around is build up brick masonry surrounding wall with inside a latrine and a septic tank.
Concerning the structure, the building is made up of pillars and beams in reinforced concrete and walls of solid baked bricks of the traditional local type. The inner sides will be coated with plaster, so as to be proper for the purpose. The foundations are made up of plinths in reinforced concrete and continuous stonewalls below the beams connecting the pillars. The floor will have to be higher at least
The building has a well for 1 water supply and is provided of an external sewage system. As there is no urban drainage system to connect to, the solution proposed, in conformity with the local system normally used, is a tank to be periodically emptied.
Vocational Center By Italian PRT in Kohsan District
at
In detail the buildings, that has a cost of € 62.122, will be composed by a rectangular plan building on one floor levels of 475 sqm. and the rooms are developed along a central corridor, to simplify route. All around is build up brick masonry surrounding wall with inside a latrine and a septic tank.
Concerning the structure, the building is made up of pillars and beams in reinforced concrete and walls of solid baked bricks of the traditional local type. The inner sides will be coated with plaster, so as to be proper for the purpose. The foundations are made up of plinths in reinforced concrete and continuous stonewalls below the beams connecting the pillars. The floor will have to be higher at least
The building has a well for 1 water supply and is provided of an external sewage system. As there is no urban drainage system to connect to, the solution proposed, in conformity with the local system normally used, is a tank to be periodically emptied.
۱۳۸۸ آذر ۱۸, چهارشنبه
Stone Foundation of Training Center By Italian PRT in Herat Jail
Today at
In detail the buildings, that has a cost of 50.161 Euro, will be constituted by a structure type “columns and beams” in reinforced concrete. It will be complete of all the finish, such as painting, iron doors and windows, inner wooden doors, oil painting, part of toilet accessories, wood fires in steel, climates.
The building is a part of a wider project aiming at the reorganization the Ministry of Justice compound where
The Italian Representatives were composed by the RC-W Commander, Brigadier General Alessandro VELTRI, Brigadier General MARTIN-
۱۳۸۸ آذر ۱۷, سهشنبه
Donation of Italian PRT For Herat Orphanage Center
LIST OF MATERIAL FOR MALE ORPHARANGE
NR. ORD | DESCRIPTION | QUANTITY |
1 | TROUSERS FOR BOYS | PAIRS 145 |
2 | SHOES FOR BOYS | PAIRS 145 |
3 | GLOVE VARIOUS SIZE | PAIRS 145 |
4 | WINTER HAT VARIOUS SIZE | PAIRS 145 |
5 | WINTER SCARVES | PAIRS 145 |
6 | WINTER SOCKS VARIOUS SIZE | PAIRS 290 |
7 | STUFE | NR 23 |
8 | KEROSENE | LT 1000 |
LIST OF MATERIAL FOR FEMALE ORPHANAGE
NR. ORD | DESCRIPTION | QUANTITY |
1 | COAT FOR GIRL | NR 85 |
2 | TROUSERS FOR GIRL | PAIRS 85 |
3 | SHOES FOR GIRL | NR 85 |
4 | GLOVE VARIOUS SIZE | PAIRS 85 |
5 | WINTER HAT VARIOUS SIZE | PAIRS 85 |
6 | WINTER SCARVES | PAIRS 85 |
7 | WINTER SOCKS VARIOUS SIZE | PAIRS 170 |
TOTAL PRICE 8.000 EURO